Implementation of BIM in construction project
Popov, Leonid (2016)
Popov, Leonid
Saimaan ammattikorkeakoulu
2016
All rights reserved
Julkaisun pysyvä osoite on
https://urn.fi/URN:NBN:fi:amk-2016111016009
https://urn.fi/URN:NBN:fi:amk-2016111016009
Tiivistelmä
The aim of the thesis was to analyse the actual technology in BIM-design of modern construction in Russia and to create a technical task for the designing of BIM model.
The first part of the thesis consists of general information about BIM, the actual situation in Russia, national standards for BIM in Russia, some words about OpenBIM and situation with BIM in YIT Saint-Petersburg.
The general part of the thesis contains a technical task for the designer which was made for the YIT Saint-Petersburg according to engineer’s and project manager’s requirements, and the plan for future: How to improve the quality of a construction project with the help of BIM technologies.
The technical task was developed for the designing of BIM model for all project stages and parts and contains requirements to levels of development for each stage of a construction project.
A lot of information was analysed from conferences, titles and national standards.
In the process of writing the thesis a conclusion was made how to use BIM more effectively in the future projects. In the future this survey can be applied by the company as a guideline.
For using Building Information Model more effectively the company should start to implement that technology in all building processes and all departments which are taking part in the construction process should be educated to use BIM software and to understand the whole system of BIM. Those steps will help to use all advantages of Building Information Modelling on all stages during the life-cycle of the object.
The first part of the thesis consists of general information about BIM, the actual situation in Russia, national standards for BIM in Russia, some words about OpenBIM and situation with BIM in YIT Saint-Petersburg.
The general part of the thesis contains a technical task for the designer which was made for the YIT Saint-Petersburg according to engineer’s and project manager’s requirements, and the plan for future: How to improve the quality of a construction project with the help of BIM technologies.
The technical task was developed for the designing of BIM model for all project stages and parts and contains requirements to levels of development for each stage of a construction project.
A lot of information was analysed from conferences, titles and national standards.
In the process of writing the thesis a conclusion was made how to use BIM more effectively in the future projects. In the future this survey can be applied by the company as a guideline.
For using Building Information Model more effectively the company should start to implement that technology in all building processes and all departments which are taking part in the construction process should be educated to use BIM software and to understand the whole system of BIM. Those steps will help to use all advantages of Building Information Modelling on all stages during the life-cycle of the object.