Theseus käyttökatko ma 22.4. klo 12 alkaen. Katko jatkuu 22.4. klo 15 asti ja on koko Theseuksen laajuinen. Lisäksi töiden käsittely ja syöttö on estetty ti 23.4. ainakin klo 12 asti.
Theseus service break from Mon 22.4. at 12:00. The break will last until 15:00 on Mon 22.4. and is Theseus-wide. In addition, processing and uploading of work will be blocked until at least 12:00 on Tue 23.4.
Haku
Viitteet 1-2 / 2
Project Closure Preparing and a Subcontractor’s Work Performance Control and Acceptance in Construction Management in Russia
(Saimaan ammattikorkeakoulu, 2010)
The goal of the bachelor’s thesis was to find out ways to decrease the amount of work during project closure by improving quality of subcontractor’s work, timely detection and termination of defects and flaws and controlling ...
Project Closure Preparing and a Subcontractor’s Work Performance Control and Acceptance in Construction Management in Russia
(Saimaan ammattikorkeakoulu, 2010)
The goal of the bachelor’s thesis was to find out ways to decrease the amount of work during project closure by improving quality of subcontractor’s work, timely detection and termination of defects and flaws and controlling ...