Haku
Viitteet 1-10 / 30
Adding Value through Corrective Preventive Warranty Claims
(2021)
This thesis is made on behalf of Wärtsilä Marine Power, Customer Assistance Warranty Services. The purpose of the thesis is to calculate how value is added to the company through corrective preventive warranty claims.
The ...
How to Optimize the Way of Working Within Commissioning
(2019)
This thesis is made on behalf of Wärtsilä Marine Solutions with the purpose of improving the way of working within the commissioning department, both for the commissioning coordination team and the site management team.
The ...
Analysis of Unit Testing Tools for Simulink Models
(2019)
This thesis was written on behalf of the Engine Control System Development department at Wärtsilä in Vaasa. Wärtsilä’s engines are controlled by many software application modules that have different functions, like controlling ...
Resource Planning Tool for Nonconformity Projects at Wärtsilä
(2019)
The thesis presents the development of a Resource Planning Tool that will be used for non-conformity projects for the Customer Assistance department at Wärtsilä. Nonconformity projects are service-related projects that ...
Design, Development and Introduction of Smart P&I Diagrams for Wärtsilä 31 Engine
(2019)
This thesis has been made for Design team W31 which is a part of Wärtsilä Finland. Design team W31 is primarily working with creating new designs and updating drawings and instructional documents for the Wärtsilä 31 ...
Product Structure and Information as a Common Model; A manufacturing company case study
(2019)
The ever-increasing customer demand for customized products is putting manufacturing companies under pressure as new products and product features must be introduced rapidly to the market. Product information and configuration ...
Evaluation of Insulation Monitoring Devices in an Isolated DC System
(2021)
This Bachelor’s thesis has been done on behalf of Wärtsilä Research & Development for the team Testing & Validation. The thesis’s purpose was divided into two main objectives: evaluating a suiting Insulation Monitoring ...
Wärtsilä Asset Diagnostic Configurator
(2019)
The Wärtsilä Condition-based Maintenance (CBM) service is nearing 20 years in operation and no longer fulfills the service requirements based on customer demand and internal feedback. This thesis aims to describe the ...
Organizing Small Parts in Storage Container to Reduce Cost, Time and Wastage of Material for Power Plant Projects
(2020)
This thesis is written for Wärtsilä Energy Business. The purpose of the thesis is to reduce the usage of fast air freight for material needed at power plant sites around the world and to make sure commissioning engineers ...
Automatisering av testprocesser vid Wärtsilä Marine Power
(2021)
Det här examensarbetet har gjorts tillsammans med Wärtsilä Marine Power vid motorlaboratorium i Vasklot, Vasa från hösten 2020 till våren 2021.
Syftet med det här examensarbetet var att undersöka möjligheten att tillverka ...