Calibrations in Medical Device Development : Building a Foundation for Infor EAM
Silbereisen, Kevin (2018)
Silbereisen, Kevin
Metropolia Ammattikorkeakoulu
2018
All rights reserved
Julkaisun pysyvä osoite on
https://urn.fi/URN:NBN:fi:amk-201805239742
https://urn.fi/URN:NBN:fi:amk-201805239742
Tiivistelmä
The goal of this work was to conduct a study on calibration in medical device technologies and investigate how calibrations are performed on medical devices by looking at the work-flow and tools available to GE Healthcare Helsinki.
Furthermore, this project was meant to prepare and possibly implement the Infor EAM system for managing the calibration equipment on GE´s Helsinki site. The intention was to replace the previous asset management system with the one provided by Infor which was already in use on multiple GE sites. This is due to risks that can be caused by outdated software.
Getting acquainted with the everyday calibration work and the software involved was essential and required cooperation with GE Digital´s Global Infor team. The transition would include to plan a schedule, migration parameters and then ensuring that all the information has been transferred correctly and completely by testing the data migrations from GAGEtrak to Infor EAM.
In the final stage after validating the data and documenting the results, the plan is to create training material for the users here in Helsinki. The project will then be completed on the official Go-live date for Infor EAM at the Helsinki site.
Furthermore, this project was meant to prepare and possibly implement the Infor EAM system for managing the calibration equipment on GE´s Helsinki site. The intention was to replace the previous asset management system with the one provided by Infor which was already in use on multiple GE sites. This is due to risks that can be caused by outdated software.
Getting acquainted with the everyday calibration work and the software involved was essential and required cooperation with GE Digital´s Global Infor team. The transition would include to plan a schedule, migration parameters and then ensuring that all the information has been transferred correctly and completely by testing the data migrations from GAGEtrak to Infor EAM.
In the final stage after validating the data and documenting the results, the plan is to create training material for the users here in Helsinki. The project will then be completed on the official Go-live date for Infor EAM at the Helsinki site.