Examining construction productivity improvement by applying Takt Time Planning to generate an execution guideline

Gjolleshi, Jeton (2020)

Avaa tiedosto
Master_Thesis-Jeton_Gjolleshi.pdf (5.129Mt)
Lataukset: 


Gjolleshi, Jeton
2020
All rights reserved. This publication is copyrighted. You may download, display and print it for Your own personal use. Commercial use is prohibited.
Näytä kaikki kuvailutiedot
Julkaisun pysyvä osoite on
https://urn.fi/URN:NBN:fi:amk-202103153343
Tiivistelmä
This Master Thesis presents a detailed analysis of three existing case studies that apply Takt Time Planning to create a steady workflow in construction projects. These case studies introduce a structured approach to scheduling a fast plan and illustrate the productivity improvements when Takt Time Planning is used as a work structuring method. Aiming for a continuous flow in construction while eliminating all types of waste requires comprehensive coordination and clear organizational features to deal with all the constraints that the implementation process presents. Therefore, the focus of this thesis is to investigate different perspectives of integrating Takt Time Planning while demonstrating the efficacy of its structured implementation.

A guideline that helps with the implementation of this planning technique is generated, and it focuses on the improvement of the triple constraints of construction management: time, cost, and quality. Shortening the construction time while maintaining the quality and reducing costs requires incentive forms of motivation for all the participants to commit on the same scope. Therefore, the application of Takt Time Planning requires a new level of collaboration between all the involved actors during all the phases of construction. Moreover, it requires analyzing pre-conditions, which simplifies the process, innovative forms of assessing the schedule’s reliability, and utilization of different tools that add value to the implementation on the scheduling process.
Kokoelmat
  • Opinnäytetyöt
Ammattikorkeakoulujen opinnäytetyöt ja julkaisut
Yhteydenotto | Tietoa käyttöoikeuksista | Tietosuojailmoitus | Saavutettavuusseloste
 

Selaa kokoelmaa

NimekkeetTekijätJulkaisuajatKoulutusalatAsiasanatUusimmatKokoelmat

Henkilökunnalle

Ammattikorkeakoulujen opinnäytetyöt ja julkaisut
Yhteydenotto | Tietoa käyttöoikeuksista | Tietosuojailmoitus | Saavutettavuusseloste