Tiivistelmä
The present study consisted of the development of a digitalized method for X-band weather radar testing and calibration processes, in the field of electrical engineering. To achieve the outcome the subject was studied to understand the requirements of different stakeholders related to the weather radar customer delivery projects.
Due to the nature of this project, which has been developed internally at an internship in Vaisala Oy during the summer of 2022, some names of the programs and key names have been modified, and some confidential information has not been mentioned at all like reference documents.
At the end of the project, there was a design process which led to the final execution of the weather radar test and calibration processes with the chosen system configuration. Based on the research and study, there was a conclusion on the most suitable procedure and the creation of an electrical procedure instruction, which was tested in a real production environment and implemented afterwards.
Some other phases during the development of the project were collecting feedback and making necessary adjustments and root improvements to the procedure.
Due to the nature of this project, which has been developed internally at an internship in Vaisala Oy during the summer of 2022, some names of the programs and key names have been modified, and some confidential information has not been mentioned at all like reference documents.
At the end of the project, there was a design process which led to the final execution of the weather radar test and calibration processes with the chosen system configuration. Based on the research and study, there was a conclusion on the most suitable procedure and the creation of an electrical procedure instruction, which was tested in a real production environment and implemented afterwards.
Some other phases during the development of the project were collecting feedback and making necessary adjustments and root improvements to the procedure.