Hyppää sisältöön
    • Suomeksi
    • På svenska
    • In English
  • Suomi
  • Svenska
  • English
  • Kirjaudu
Hakuohjeet
JavaScript is disabled for your browser. Some features of this site may not work without it.
Näytä viite 
  •   Ammattikorkeakoulut
  • Vaasan ammattikorkeakoulu
  • Opinnäytetyöt (Avoin kokoelma)
  • Näytä viite
  •   Ammattikorkeakoulut
  • Vaasan ammattikorkeakoulu
  • Opinnäytetyöt (Avoin kokoelma)
  • Näytä viite

Navigating Complexities : Examining Project Managerial Challenges in the Implementation of LNGBased Carbon Capture and Storage Projects

Asafo-Adjei, Benjamin Adu (2025)

 
Avaa tiedosto
Asafo-Adjei_Benjamin.pdf (1.043Mt)
Lataukset: 


Asafo-Adjei, Benjamin Adu
2025
All rights reserved. This publication is copyrighted. You may download, display and print it for Your own personal use. Commercial use is prohibited.
Näytä kaikki kuvailutiedot
Julkaisun pysyvä osoite on
https://urn.fi/URN:NBN:fi:amk-2025073123753
Tiivistelmä
The liquefied natural gas (LNG) industry is widely recognised for its high carbon emissions, which increased by 2.5% in 2024, intensifying the need for decarbonisation technologies such as Carbon Capture and Storage (CCS). Despite this urgency, CCS implementation in LNG projects continues to face persistent failures and underperformance. This study explored the implementation challenges associated with LNG-based CCS projects and identified managerial responses and best practices.

Using a systematic literature review approach, secondary data were systematically and purposively retrieved from research databases and synthesised through content analysis to generate thematic insights.

The study found that LNG-based CCS projects encounter multifaceted technical, economic, financial, social, and managerial challenges that undermine performance and legitimacy. Technical failures include injection well integrity breaches, material degradation, and CO₂ transport instabilities, while financial viability is threatened by chronic cost overruns. Social acceptance remains constrained by public scepticism and NGO critiques. Project managers respond with adaptive foresight, decentralised decision-making, stakeholder engagement, and reflexive monitoring. The study concludes that integrated adaptive leadership, multi-level governance, contextual intelligence, and strategic risk design are essential for effective LNG-based CCS project management, enabling operational resilience and enhancing implementation feasibility.
Kokoelmat
  • Opinnäytetyöt (Avoin kokoelma)
Ammattikorkeakoulujen opinnäytetyöt ja julkaisut
Yhteydenotto | Tietoa käyttöoikeuksista | Tietosuojailmoitus | Saavutettavuusseloste
 

Selaa kokoelmaa

NimekkeetTekijätJulkaisuajatKoulutusalatAsiasanatUusimmatKokoelmat

Henkilökunnalle

Ammattikorkeakoulujen opinnäytetyöt ja julkaisut
Yhteydenotto | Tietoa käyttöoikeuksista | Tietosuojailmoitus | Saavutettavuusseloste