Flowchart of the construction phase of a wind farm

Ravaska, Jesse (2021)

 
Avaa tiedosto
Ravaska_Jesse.pdf (3.162Mt)
Lataukset: 


Ravaska, Jesse
2021
All rights reserved. This publication is copyrighted. You may download, display and print it for Your own personal use. Commercial use is prohibited.
Näytä kaikki kuvailutiedot
Julkaisun pysyvä osoite on
https://urn.fi/URN:NBN:fi:amk-202105168861
Tiivistelmä
This thesis was commissioned by VSB Uusiutuva Energia Suomi Oy. The purpose of the thesis was to study and survey the key agreements and work phases of the construction of a wind farm. The aim was to study and compile a comprehensive knowledge base, which made it possible to create a flowchart to guide the construction phase of the wind farm.

The thesis has three parts. The first part reviews wind power at a general level, VSB’s Juurakko wind farm and three different long-term power purchase agreements, i.e., PPAs. The second part reviews the construction phase of the wind farm step by step. The third part reviews the flowchart created for the thesis commissioner.

The theory and research part of the thesis, were performed using the material provided by the commissioner, concerning the Kalajoki Juurakko wind farm, which is under construction. In order to compile a better knowledge base, common literature on the construction phases of various wind and construction projects, general standards and contract terms used in Europe, as well as design and work instructions for the various work phases were used.

During the research, it was found out that the wind projects included two main building contracts covering all design and construction-related works. The two main building contracts are the Balance of Plant Agreement and Turbine Supply Agreement. Challenges to the research work were caused by the scope of the topic and its compilation into the most comprehensive and clear entity possible. The research work was comprehensive enough to create the desired flowchart for the commissioner as a final product.
Kokoelmat
  • Opinnäytetyöt (Avoin kokoelma)

Samankaltainen aineisto

Näytetään aineisto, joilla on samankaltaisia nimekkeitä, tekijöitä tai asiasanoja.

  • Marketing Strategic Choices for Wind Technology in China : case: Chinese Domestic Wind Technology Companies 

    Shi, Yi (Lahden ammattikorkeakoulu, 2011)
    There are almost 80 wind turbine manufacturers in China. However, the supportive government policies are the fact behind the rapid growth of those case companies. In reality, there are less than 10 Chinese wind turbine ...
  • Marketing strategic choice for wind power technology in China : case: Chinese domestic wind technology companies 

    Shi, Yi (Lahden ammattikorkeakoulu, 2011)
    There are almost 80 wind turbine manufacturers in China. However, the supportive government policies are the fact behind the rapid growth of those case companies. In reality, there are less than 10 Chinese wind turbine ...
  • Sizing and Utilising Hydrogen Storage for Excess Wind Power: a case study: EPV Energia wind farm Torkkola, Vaasa, Finland 

    Laurén, Fanny (2022)
    To combat global warming and climate change, energy generation must move from non-renewable to renewable. An energy system with purely renewable energy generation comes with its challenges as the dispatchability of renewable ...
Ammattikorkeakoulujen opinnäytetyöt ja julkaisut
Yhteydenotto | Tietoa käyttöoikeuksista | Tietosuojailmoitus | Saavutettavuusseloste
 

Selaa kokoelmaa

NimekkeetTekijätJulkaisuajatKoulutusalatAsiasanatUusimmatKokoelmat

Henkilökunnalle

Ammattikorkeakoulujen opinnäytetyöt ja julkaisut
Yhteydenotto | Tietoa käyttöoikeuksista | Tietosuojailmoitus | Saavutettavuusseloste