Techniques of construction delay analysis : a study of application and enhancement criteria
Megahed, Ayman (2022)
Megahed, Ayman
2022
All rights reserved. This publication is copyrighted. You may download, display and print it for Your own personal use. Commercial use is prohibited.
Julkaisun pysyvä osoite on
https://urn.fi/URN:NBN:fi:amk-2022102121517
https://urn.fi/URN:NBN:fi:amk-2022102121517
Tiivistelmä
Both the employer and the contractor place a high value on project completion time. Analysis of project delays was critical for contractual parties in order to make informed decisions about future compensation claims. Even if delay analysis techniques (DAT) have proven useful over the years, the high number of disagreements around the resolution of delays has not decreased. Concerns concerning the limits and capabilities of current technology have been raised.
Construction delays, the causes and types of delays, and methods for analyzing timetable delays are all explored. The article discusses two case studies in order to get to the bottom of the research question. Case studies on the Berlin-Brandenburg airport and a hypothetical restaurant storage facility are presented here. The paper details the implementation of the delay analysis technique. Time overruns and cost overruns might result from delays in construction, according to one of the case studies. Inconvenient delays in a project's construction timetable may cause significant problems for the project's contractors and owners, leading to costly disputes, contentious issues, and strained relationships among all parties.
There are a variety of reasons why projects go behind schedule, but this thesis focuses on two case studies and examines the approaches used in the past. A wide- ranging examination of delays. Various methods were used to determine the length of the construction delays and who was to blame. Final results include an examination of two delay analysis approaches' limits, which shows that each technique has a distinct set of drawbacks that may require a certain delay technique to be used by the project team.
Construction delays, the causes and types of delays, and methods for analyzing timetable delays are all explored. The article discusses two case studies in order to get to the bottom of the research question. Case studies on the Berlin-Brandenburg airport and a hypothetical restaurant storage facility are presented here. The paper details the implementation of the delay analysis technique. Time overruns and cost overruns might result from delays in construction, according to one of the case studies. Inconvenient delays in a project's construction timetable may cause significant problems for the project's contractors and owners, leading to costly disputes, contentious issues, and strained relationships among all parties.
There are a variety of reasons why projects go behind schedule, but this thesis focuses on two case studies and examines the approaches used in the past. A wide- ranging examination of delays. Various methods were used to determine the length of the construction delays and who was to blame. Final results include an examination of two delay analysis approaches' limits, which shows that each technique has a distinct set of drawbacks that may require a certain delay technique to be used by the project team.
Kokoelmat
Samankaltainen aineisto
Näytetään aineisto, joilla on samankaltaisia nimekkeitä, tekijöitä tai asiasanoja.
-
Construction waste management : case studies YIT Russia : overview of construction waste management at YIT construction sites and suggestions for further development
Mladenov, Aleksandar (2021)The purpose of this bachelor thesis is to understand how construction waste is handled and what can be improved in the cases of Russian construction sites. Additionally, this paper proposes new ideas for construction waste ... -
Construction 4.0 in Ostrobothnia : Exploring the Stage of Digitization in Construction, Real Estate, and Public Organizations
Ravald, Alex (2021)This Master’s thesis examines the concept known as Construction 4.0. The concept is adding value to the construction industry by offering digitalized technologies and adoption of the Lean mindset. As a way to prosper and ... -
Innovative methods of construction based on experience of NCC Construction
Morozova, Ekaterina (Saimaan ammattikorkeakoulu, 2013)The purpose of the thesis was to investigate the innovative ways of construction according to experience of NCC Construction (Russia). The object of studying was residential complex Swedish Krona in Saint-Petersburg. This ...